When considering whether to proceed with a construction project, an assessment of funding options will generally be carried out. One of the options may be 'mezzanine finance', particularly in times of economic hardship when banks may take a more risk adverse stance in relation to property development.
Mezzanine finance provides a second layer of debt funding to bridge the gap between the senior debt (typically provided by a bank or fund), and the actual requirements of the developer. In the event of default the mezzanine lender will be paid only after the senior lenders. Equity investors are than last in line and receive whatever is left.
This means mezzanine financiers are bearing more risk than senior lenders, but less than equity owners.
Returns on investment for lenders of mezzanine finance can be around 20%. While this is typically more expensive for the developer than senior debt, it may be less expensive in the long term than their own equity, and as short-term funding it can help to unlock potential profits, so the longer-term benefits can be considerable.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Shortage of high-quality data threatening the AI boom
And other fundamental issues highlighted by the Open Data Institute.
Data centres top the list of growth opportunities
In robust, yet heterogenous world BACS market.
Increased funding for BSR announced
Within plans for next generation of new towns.
New Towns Taskforce interim policy statement
With initial reactions to the 6 month policy update.
Heritage, industry and slavery
Interpretation must tell the story accurately.
PM announces Building safety and fire move to MHCLG
Following recommendations of the Grenfell Inquiry report.
Conserving the ruins of a great Elizabethan country house.
BSRIA European air conditioning market update 2024
Highs, lows and discrepancy rates in the annual demand.
50 years celebrating the ECA Apprenticeship Awards
As SMEs say the 10 years of the Apprenticeship Levy has failed them.
Nominations sought for CIOB awards
Celebrating construction excellence in Ireland and Northern Ireland.
EPC consultation in context: NCM, SAP, SBEM and HEM
One week to respond to the consultation on reforms to the Energy Performance of Buildings framework.
CIAT Celebrates 60 years of Architectural Technology
Find out more #CIAT60 social media takeover.
The BPF urges Chancellor for additional BSR resources
To remove barriers and bottlenecks which delay projects.
Flexibility over requirements to boost apprentice numbers
English, maths and minimumun duration requirements reduced for a 10,000 gain.
A long term view on European heating markets
BSRIA HVAC 2032 Study.
Humidity resilience strategies for home design
Frequency of extreme humidity events is increasing.
National Apprenticeship Week 2025
Skills for life : 10-16 February